Tool matrix
Compare all 13 cleaning tools by construction, MOQ and packing
Thirteen tools across brushes, sponges and cloths, and construction is what sets the price: PP handles with nylon bristles sit at one MOQ tier, PU foam and microfibre at another. Every SKU is listed at its standard build so a buyer can compare landed cost per carton rather than per unit.
- MOQ
- 500 – 1,000 pcs
- Carton
- 100 – 1,000 pcs
- Pallet
- 6 – 24 cartons
- Sample lead time
- 7 days
| Tool | Model | Construction | MOQ | Carton | Pallet |
|---|---|---|---|---|---|
| Brushes6 SKUs | |||||
| TL04 | PP + TPR + nylon | 500 | 100 | 24 | |
| TL03 | PP + TPR + nylon | 500 | 100 | 24 | |
| TL01 | PP handle + PU sponge head | 500 | 400 | 16 | |
| TL07 | PP + nylon | 500 | 100 | 24 | |
| TL09 | PP + silicone | 500 | 200 | 20 | |
| GL03 | PP + silicone | 1000 | 300 | 20 | |
| Sponges5 SKUs | |||||
| TL10 | PP handle + PU foam + abrasive pad | 1000 | 100 | 24 | |
| DW04 | PU foam + abrasive pad | 1000 | 100 | 24 | |
| TL08 | PU foam + abrasive pad | 1000 | 1000 | 12 | |
| TL05 | Melamine foam | 1000 | 1000 | 12 | |
| TL02 | Wood pulp cellulose | 1000 | 700–1000 | 12 | |
| Cloths & towels2 SKUs | |||||
| GL02 | Microfibre 80/20 | 1000 | 100–200 | 6 | |
| TL06 | Microfibre 80/20 | 500 | 100–200 | 6 | |
Construction drives the price, not the shape
Two sponges can look identical and differ threefold in cost per carton: PU foam with an abrasive pad is a different build from wood-pulp cellulose. The construction column is the one to read before comparing quotes.
Bristle and fibre grade are specified at brief
Nylon bristle diameter, microfibre blend and PU foam density are all open to specification. Changing them moves the sample, not the MOQ, so a grade trial is cheap to run.
Packing is per SKU, not per range
Carton and pallet counts differ by tool size, so a mixed order consolidates at pallet level rather than carton level. Send the mix and we return a pallet plan.
Carton and pallet counts are for the standard retail pack. A dash in the construction column means the build is set at brief stage. Send the spec and we will quote against it.
















